Sungrow Installation

Step 22

See a video tutorial for Step 22 and/or follow the instructions: Cutting the 2m long polycarbonate sheets is as easy as cutting lightly with a kni...

Step 21

Use the butt end strap (part 16) to tie down the seal and polycarbonate sheets along the seam using M5X35 screws.

Step 20

Starting from the bottom of the right-hand side, insert the seal (attaches on the polycarbonate and metal frame) to the bottom corner of the left-h...

Step 19

Line up the ridge panel and fix it with appropriate screws.

Step 18

Start attaching the right end and left end polycarbonate sheets ensuring that you cover all sides with adhesive tape. Ensure that the sheet aligns ...

Step 17

Fix the doors and windows to the assembled frame. Insert the handles and bend them to the opposite side.

Step 16

Additionally, ensure the greenhouse is levelled properly before fixing doors and windows.

Step 15

 See a video tutorial for Steps 15-21 and/or follow the instructions below: Before fixing the assembled greenhouse frame to the base, ensure that ...

Step 14

See a video tutorial for Step 14 and/or follow the instructions below: In this step, a similar process to that in step 13 for the windows is foll...

Step 13

See a video tutorial for Step 13 and/or follow the instructions below: On the window frames, install hinges and insulation using the M5X10 screws. ...

Step 12

 See a video tutorial for Step 12 and/or follow the instructions below: For the window frames, line up the ventilating window horizontal (part 19)...

Step 11

See a video tutorial for Step 11 and/or follow the instructions below: Assembly of the supporting arches. Get the brace spreader (part 11), the re...