This video tutorial for assembly of steps 1-9
Fix two beams (part 2) on either side at the middle and bottom sections of the lower arches (4h) that you have connected to the assembly. At the bottom, the beam should be fixed to the top two inner screw holes. The bottom holes are used to attach the greenhouse frame to the base.